Originally Posted by
fc735
it will be about a mile closer to roanoke on 221. i got the slab poured, and ready to hang the building. should be starting on the steel next week if all goes well with finishing up a draw from the bank.
10,000 sq ft, recessed alignment rack, and inground lifts is much better than the 4200 sq ft we have been using. its pretty much a 12 bay shop with a 120' pull through bay for road tractors and coaches.
gimme a holler sometime, and i will show you it. we are trying to be in it by june/july, but we dont know yet.
Sounds good man. I'll try and get up there Monday. I think I'm off from both jobs Monday.
I have something else going on that morning that requires a rollback...